New Active Neighbourhood Plans released

The revised plans for the Levenshulme and Burnage Active Neighbourhood have been released. Full information is available on the new website HERE.

The project has now been split into two with Phase 1 covering Levenshulme and Phase 2 covering Burnage. A trial of road blocks / “modal filters” will start in December 2020 and last for a minimum of six months.

Note that a “modal filter” is the name given to something that blocks the road to vehicular traffic but still allows access through for pedestrians and cyclists (and presumably mopeds and motorbikes).

Manchester City Council says:

We now have a plan for the future direction of the project, and have decided to tackle it in two phases. We would like your feedback on some of the measures which we are going to trial (Phase 1). The trial measures will start to be put in place from December (during school holidays).This is also a great way for the scheme to be seen in action, tested and analysed, so it can be tweaked or changed where required but also allow peoples habits to change and through traffic to re-route.

Because of the density of schools in the Cringle Park (Phase 2) area, and issues with traffic congestion, we are continuing to seek opinions from local residents, businesses and schools on what measures are needed and where before they are trialled.

We hope to commence the trial in the Festive season break in December and will last a minimum of 6 months. The final designs for the Active neighbourhood will be drawn up based on the results of the consultation and implemented within 18 months should the funding application be successful.

MCC Active Neighbourhood Plans

The Phase 1 trial area excludes Burnage. No date has been suggested yet for Phase 2 in Burnage. The Phase 1 / Phase 2 split has been done based on political Wards, not the Park Area cells the Project has identified which is why the Henderson Street road block / “modal filter” is included in Phase 1.

The Levenshulme Phase 1 trial identifies 25 road blocks / “modal filters” outlined on the map below. The revised plans are not very different to the original plans. We will look at them in detail and post further information once we have worked out what differences there are.

The Phase 1 trial is still primarily for road blocks / “modal filters”. The council is also asking for feedback on where temporary crossings and traffic calming could be located as part of its Phase 1 consultation. The council says:

The trial includes a number of temporary crossing points and traffic calming measures to provide immediate benefits on routes that have been raised through previous consultation. [ * ]

We understand from previous feedback that traffic volume and speeds make certain streets hard to cross. We’d like you to tell us where you feel crossing points or traffic calming may help day to day life and make getting around safer and easier.

Further community feedback on the locations of these is welcomed, so that a final Trial Plan can be developed. The trial plan has a degree of flexibility once live, but we need to allow the trial to bed in to understand how habits change and the trial is being used. 

MCC Active Neighbourhood crossings and traffic calming

[ * NOTE: there is no evidence of this on the map for the Phase 1 trial]

Give your feedback

Phase 1 feedback (Levenshulme) can only be made by responding to the 25 locations identified by the council. You can, however, drop a pin on the map for the Phase 2 feedback (Burnage) to identify a location and comment where you think an intervention could or should be located.

Phase 1 (Levenshulme)

You can comment HERE on the proposed road blocks / “modal filters”.

You can comment HERE on where you think crossings and traffic calming should go.

You can comment HERE on the whole scheme.

Phase 2 (Burnage)

You can comment HERE on what measures you think should be included in Phase 2.

How has the Project Changed?

There are a number of differences between the May proposals and the new proposals released in September. A summary is provided here for reference.

Levenshulme and Burnage Active Neighbourhood Project v1 and v2 Comparison

( RB/MF = Road Block / “Modal Filter” )

 Version 1May 2020Version 2 Sept 2020v2 Map ref.Changes
Green Bank Park Area    
Longden RoadRB/MFRB/MF1Same as v1
Armitage AvenueRB/MFRB/MF2Same as v1
Mayford RoadRB/MFRB/MF3Same as v1
Guildford Road / Audley RoadRB/MF (Diagonal)RB/MF4Moved along Guildford Road and now a standard RB/MF
Stovell Avenue / Northmoor RoadBus Gate  Bus Gate removed
Manor Road 1 (between Barlow Road and Rushmere Avenue)RB/MFRB/MF5Same as v1
Manor Road 2 RB/MF6Moved to where a new crossing was proposed originally
Caremine Avenue RB/MF7EXTRA RB/MF
Portville RoadRB/MFRB/MF8Same as v1
Dunstable StreetRB/MFRB/MF9Same as v1
Barlow RoadRB/MFRB/MF10Same as v1
Cardus Street (North) RB/MF11EXTRA RB/MF and road changed to two-way traffic
Chapel Street Park Area    
Cardus Street (South) RB/MF12Same as v1
Chapel Street (West)RB/MFRB/MF13Same as v1
Chapel Street (East)RB/MFRB/MF14Same as v1
Chapel Street / Stockport Road junction   Changed to two-way traffic
Atlas PlaceRB/MFRB/MF15Same as v1
Delamere Road (West)RB/MFRB/MF16Same as v1 with road changed from one-way to two-way traffic
Delamere Road / Gordon AvenueRB/MF (Diagonal)RB/MF17Same as v1
Crayfield RoadRB/MFRB/MF18Same as v1
Marley RoadRB/MFRB/MF19Same as v1
Dorset RoadRB/MFRB/MF20Same as v1
Molyneux RoadRB/MFRB/MF21Same as v1
Broom Lane / Stockport Road junction   Changed to allow left and right turning
Cromwell Grove / Stockport Road junction   Changed to allow left and right turning
West Point Gardens Area    
Osborne RoadRB/MFRB/MF22Same as v1
Victoria RoadRB/MF (Diagonal)RB/MF23Changed from diagonal RB/MF to standard and moved to junction with Albert Road
Buckhurst RoadRB/MFRB/MF24Same as v1
Green DriveRB/MF  RB/MF removed (private road)
Lytham RoadRB/MF  RB/MF removed and road left as it is now
Cringle Park Area (Burnage)    
Fortuna Grove / Monica GroveRB/MF (Diagonal)  Further consultation
Burnage Hall RoadRB/MF  Further consultation
Slade Lane (near Linden Park)Bus Gate  Further consultation
Errwood Road (near Alma Park Primary)Bus Gate  Further consultation
Clare RoadRB/MF  Further consultation
Alma RoadRB/MF  Further consultation
Henderson StreetRB/MFRB/MF25Same as v1
L&B Active Neighbourhood Version Comparison (May plan v1 / September Plan v2)

Levenshulme & Burnage Active Neighbourhood Phase 1 Map

You can view the map online HERE or download a PDF version below.

MEN Article On School Traffic “Chaos”

Levenshulme is in the news with an article in the Manchester Evening News about traffic problems around schools.

“A community campaign group [Streets For People] is urging local councillors to take action on dangerous parking and increased school traffic in south Manchester.”

Extract from MEN article

Streets For People is hosting a Zoom meeting on Sunday 20th September 2020 at 3pm. The group says:

We are organising a public meeting on the issue of what’s happening with the Low Traffic Neighbourhood proposals, and especially the council’s inaction on the dangerous situation outside schools caused by motor traffic.

We challenge the Levenshulme and Burnage councillors and council leadership to attend this meeting and explain to residents what is happening.”

Streets For People

Read the full article HERE

You can view the Streets for People video below or on their website HERE.

GM Road Charging Clean Air Plan

Government has directed Greater Manchester to introduce a ‘category C’ charging Clean Air Zone. This would cover local roads across the whole of Greater Manchester from spring 2022, operating 24 hours a day, seven days a week. The intention is to to bring nitrogen dioxide (NO2) levels on local roads within legal limits as soon as possible.

The proposed Clean Air Zone aims to:

  • Bring NO2 emissions within legal limits as soon as possible and by 2024 at the latest.
  • Discourage polluting commercial vehicles from travelling on local roads in Greater Manchester.
  • Encourage businesses to switch to cleaner, low- or zero-emission vehicles.

The proposed Zone would cover all local roads across Greater Manchester. It would not include motorways and some main trunk roads managed by Highways England. The exact boundary is being developed by looking in detail at the local road network and using public feedback. See the Greater Manchester boundary, and the stretches of roads which have been identified as breaching legal NO2 limits without action, on our MappingGM page.

The most polluting commercial vehicles would pay a daily charge to travel on local roads in the Zone. Private cars, motorbikes and mopeds would not be charged. The Zone would be enforced by a network of Automatic Number Plate Recognition (ANPR) cameras.

The following are proposed daily charges for the non-compliant commercial vehicles:

  • Buses, coaches and Heavy Good Vehicles (HGV) – £60 (from spring 2022)
  • Taxis and private hire vehicles – £7.50 (from spring 2022)
  • Light Goods Vehicles (LGV) such as vans and minibuses – £10 (temporary exemption until 2023)

If the daily charge for a non-compliant vehicle isn’t paid, a Penalty Charge Notice (PCN) of £120 would be issued, in addition to the unpaid daily charge.

The 10 Greater Manchester local authorities have worked together to consider a wide range of measures to tackle air pollution, alongside a Clean Air Zone. Together, these form the Greater Manchester Clean Air Plan.

The costs of introducing a Clean Air Zone are covered by government. 

Further information including proposed charges are available HERE.

An eight week consultation will be launched in October 2020.

School Crossing Safety Improvements

Significant improvements are taking place to the roads around our schools as part of a road safety project by Manchester City Council. Full details of the improvements are provided below.

The schools affected in this area are:

  • Acacias Primary School
  • Alma Park Primary School
  • Chapel Street Primary School
  • Crowcroft Park Primary School
  • Levenshulme High School for Girls
  • St Mary’s Primary School
  • St Richard’s Primary School

The aims are:

  • to reduce the speed that traffic can move around the school
  • to increase the visibility of the crossing
  • to stop drivers parking on or near the crossing.  

Manchester City Council says:

“We’re committed to making the roads around our schools much safer. These improvements are essential and should encourage more families to walk to school.

The improvements have been designed specifically for each crossing location, taking into account facts and figures relating to accident data and evidence from the site and surrounding areas.

We believe that these measures will make our school neighbourhoods much safer environments, and reduce the likelihood of accidents happening.”

Manchester City Council School Road Safety Projects

The council announcements are available HERE. Work has already started on the Chapel Street Primary School improvements.

If you wish to comment on these changes you can email the council at: engcp8@manchester.gov.uk

Please note that this project is not part of the Active Neighbourhood proposals currently in development that were previously badged as Levenshulme Bee Network.

What are the changes?

Acacias Primary School

  • Burnage Lane / School Entrance
    • Zebra Crossing
    • Bollards
    • Guardrail
  • Crossley Road and Moorton Avenue
    • Speed cushions / traffic calming
    • Bollards

Alma Park Primary School and St Mary’s Primary School

  • Errwood Road / Clare Road / Buckhurst Road
  • (assumed roads as specific locations not specified apart from Buckhurst Road)
    • Flat top junction/crossing
    • Tactile paving
    • New signage
    • Renew road markings
    • Tighten Buckhurst Road junction
    • Raised puffin crossing
    • Speed cushions
    • Bollards and railings

Chapel Street Primary School

  • Barlow Road / Cromwell Grove
    • Tighten junction
    • Realign island
    • Signalised crossing
    • ‘No Waiting At Any Time’ markings
  • Broom Lane / Chapel Street
    • Speed cushions
    • New signs and road markings

Crowcroft Park Primary School / St Richard’s Primary School

  • Northmoor Road / Stovell Avenue / Wilpshire Avenue
  • (assumed roads as specific locations not specified)
    • Kerb buildout to slow traffic
    • Bollards to prevent dangerous parking
    • Dropped kerbs for increased access
    • Tactile paving
    • Refreshed road markings
    • Reduced foliage for increased visibility

Levenshulme High School for Girls

  • Burnage Lane / school gates
    • Zebra crossing
    • Bollards
    • Guardrails
  • Crossley Road/ Moorton Ave
    • Speed cushions/ traffic calming
    • Bollards

Play Streets for Manchester

Manchester City Council has confirmed a new opportunity for residents to organise Play Streets. The council says:

“We want more of our residents from all parts of the city to come together to close the road or street where they live to help children’s play. A group of residents can apply to close their road on a regular basis for a few hours each time so there is no danger or inconvenience from through traffic.”

Full details are available HERE including information on:

  • suitable streets
  • when to hold a play street session
  • getting support from neighbours
  • managing traffic
  • volunteers and marshalls
  • fees and how to apply for permission
  • getting support from your local Neighbourhood Team

Play Streets were trialled in Levenshulme in 2019 as part of the Levenshulme Active Neighbourhood Project via the Levenshulme Bee Network group. Six streets ran Play Street trials including Osborne Road and Central Avenue. There was a report on the Osborne Road trial in the Manchester Evening News which can be read HERE.

Although Levenshulme Bee Network is no longer part of the Active Neighbourhood Project that project continues and you can organise Play Streets by following the council guidance. The idea for Play Streets was borrowed from the Playing Out community project that started in Bristol in 2011. You can find out about them HERE and get ideas for how to make Play Streets work.

Levenshulme Play Street Trial 2019, Osborne Road

Statement From Levenshulme Councillors

Levenshulme councillors have released a statement regarding the continuation of the “Levenshulme Bee Network” project.

Levenshulme Bee Network Through Routes

A trial will start in July 2020 of some of the Levenshulme Bee Network changes to our roads. 29 locations will have changes with roads being blocked to vehicle traffic. But which roads will not be affected?

Residents have made their own maps to help people see which routes will not have road blocks to vehicles on them starting in July (referred to as “modal filters”). These roads are likely to have significantly increased traffic.

The reason these have been done is the Levenshulme Bee Network maps do not show which roads traffic in the area will be redirected onto and can be used as “through routes”. They have been done by residents to help everyone understand the impact of the project and so people can plan how to change the routes they take from July.

Roads that traffic will be diverted onto:

  • Albert Road
  • Barlow Road
  • Broom Lane 
  • Cromwell Grove 
  • Crossley Road
  • Grangethorpe Drive 
  • Hemmons Road
  • Kingsway 
  • Matthews Lane 
  • Moseley Road
  • Mount Road
  • Slade Lane (north of Albert Road)

See below for the maps. Further information on the July changes can be found HERE

Continue reading

Videochats About Road Changes

Levenshulme Bee Network is holding a series of “webinars” on the “Filtered Neighbourhood Trials” starting in July 2020. These involve blocking off roads to motorised vehicles in 29 locations across the area. Pedestrians and cyclists can still access these roads through the “filters”.

Please see the LCA post HERE for full details including maps.

The Webinars will be held:

Saturday 4th July

  • 11.00-12.30 Chapel Street Park Area
  • 13.00-14.30 Cringle Park Area

Sunday 5th July

  • 11.00-12.30 Greenbank Park Area
  • 13.00-14.30 West Point Gardens Area

To participate in a webinar send and email to hello@levenshulmebeenetwork.co.uk quoting the Park Area you are interested in.

UPDATE

You can now register directly using the links below. After registering, you will receive a confirmation email containing information about joining the webinar.

Topic: Chapel Street Park Area Webinar + Q&A

  • When: Jul 4, 2020 11:00 AM
  • Register in advance for this webinar: HERE

Topic: Cringle Park Area Webinar + Q&A

  • When: Jul 4, 2020 01:00 PM
  • Register in advance for this webinar HERE

Topic: Greenbank Park Area Webinar + Q&A

  • When: Jul 5, 2020 11:00 AM
  • Register in advance for this webinar HERE

Topic: West Point Gardens Park Area Webinar + Q&A

  • When: Jul 5, 2020 01:00 PM
  • Register in advance for this webinar HERE

ANOTHER UPDATE

Q & A

If you would like to send in any questions for the Q and A – we are using the links below to collect questions so people can ask and then upvote the most popular ones to be answered in the sessions.

Submit Cringle Field Park Webinar questions HERE

Submit Chapel Street Park Webinar questions HERE 

Submit Greenbank Park Webinar questions HERE

Submit West Point Gardens Webinar questions HERE

If you would like to get in touch about anything please email trial@levenshulmebeenetwork.co.uk

Dramatic Road Changes From July 2020

Levenshulme and surrounding areas are about to experience major changes to our roads.

This is the first stage of the changes being imposed by the Levenshulme Bee Network Project. This is a new idea to create a “Filtered Neighbourhood” and to make walking and cycling easier by blocking off roads and restricting access for motorised vehicles. A whole host of other ideas are planned as well. This is just the start.

Travelling around Levenshulme and getting to and from the area will never be the same again.

12 June update

Please note that the information below was correct when it was posted. However, Levenshulme Bee Network has now changed the description on its website about the July 2020 changes. There is nothing on their website to indicate this has been changed.

Original text when the announcement was made:

“In the next few weeks we will be installing 29 temporary modal filters throughout the neighbourhood.

These will remain in place for a minimum of six months whilst we consult and tweak the filters with your feedback. They will then become permanent within 18 months.”

New text as of 12 June 2020:

“In the next few weeks we will be installing 29 temporary modal filters throughout the neighbourhood.

The trial will be undertaken using an experimental traffic regulation order which means that we can make changes following your feedback and monitor the impact for the first 6 months before the Council decides if the filters will be implemented on a permanent basis. All feedback from residents and monitoring of traffic, pedestrian and cycling levels as well as air quality levels will be considered before any of the filters are installed permanently.”

See below for details of the roads that will be affected, what will be done in July and maps including these changes.

Continue reading

Fallowfield Loop £4.9m investment

£4.9 million investment announced for the Fallowfield Loop

Fallowfield Loop enhancements (£4.9m)
This scheme will create a 24/7, orbital cycle and walking route connecting Chorlton to Gorton. It is proposed to introduce new lighting and to improve access points along this 12km, traffic-free cycle path.

More information available HERE

https://www.manchester.gov.uk/news/article/8328/manchester_announces_new_walking_and_cycling_schemes_as_mayor_and_commissioner_call_on_government_for_long-term_funding_commitment

What Is Your Vision For Levenshulme?

Everyone is welcome to a meeting to discuss the future of Levenshulme at 7.30pm on Wednesday 27th September at The Klondyke (1Burnage Range).

This will be the first of a series on public meetings and consultations where we can all suggest ideas and priorities for how we want Levenshulme to develop over the next few years.

There is no set agenda as this is something driven by us all but discussion will be guided and notes kept so all views are valued. This is an initiative by our community for our community.

  • How do you want to see Levenshulme develop?
  • What are your priorities for the future?
  • What are the main issues that need addressing?
  • How can we work together effectively to make our community what we want it to be?
  • What is your vision for Levenshulme?

A6 Resurfacing 22 April – 7 May

MANCHESTER CITY COUNCILTEMPORARY ROAD TRAFFIC REGULATION ORDER

ROAD TRAFFIC REGULATION ACT 1984 SECTION 14 (AS AMENDED)

ORDER NO. MCC0001742-
The City of Manchester (STOCKPORT ROAD, LEVENSHULME) (TEMPORARY Prohibition of Vehicular Traffic) Order 2017

The effects of the notice will be to prohibit access and egress by vehicular traffic at the side roads connecting onto Stockport Road between Broom Lane and Crossley Road as specified in the schedule to this Notice. Between 07:00 hrs and 19 00hrs Weekends only.

The City Council is satisfied that this prohibition is necessary in order to facilitate Highway Improvement Scheme works. It is expected that the works will be in progress between 22 April 2017 and 07 May 2017 Stockport Road will remain open at all times for the duration of the works.

SCHEDULE

Crossley Road 

Lloyd Road 

Hardicker Street  

Nall Street  

Cringle Road

Broom Lane